Table of Contents
20190322T1117+0000: D3.4 Telco
- IMAC?? leaves consortium
- Internal discussion on right leading partners
- mno, authorities, etc
- ToC Deliverable
- Kostsas: only reporting, revise when d2.x are mature
- Comment.
- Meeting, core team adhoc, telco in few weeks.
20190222T1014+0000:
- local trial site focuses on aspects that can support corridor use-cases (e.g., TR-GR): handover, beam forming, etc.
- TR use case see what I see: needs MEC, handover
- TR border control: exchange information between countries, handover, data fusion
- TODO for local site:
- in 2 weeks. align with border use-cases from border partner
20190319T1043+0000: German site meeting @DAI
1. Use case discussion
1.1 L4 Platooning
- MK presents
- Do we have 2 other L4 vehicles (Valeo, JD, vicom)?
- Valeo: for highway L4 is available
- DE: getting 4G, 5G network slice from Deutsche Telekom
- What API for slice config we can use?
- Can TR corridor support for the use-case? (MNOs, Handover)
- Requirements for TR corridor demo:
- Certification for the AV to operates on TR road (in DE we have TüV Nord)
- Timeline 2020-2021 (MK, Francoi)
- Bring AV to corridor for trial
- ITS services: LDM, EDM, cloud
- Similar operator infrastructure as in DE trial site
1.2 HD Map
- Gorka presents
- Connecting EDM, 3D maap with relevant standards, e.g., AI, OEM
- Can be align with TR but preferably with PT corridor (deployment at 1 place)
- PT is also preferred by DE if telefonica joins
- Coordinate more often with target corridor site
- Align with other Deliverable
- Challenges of data sharing, trust (sensors data at EDM), inter-stakeholders, authority
- Addresses in this project or extended activities.